RESTORATION OF THE MAIN TELEGRAPHY OFFICE IN BERLIN-MITTE WITH MEA LIGHT WELLS

The old Main Telegraph Office in central Berlin was built between 1910 and 1916. At the time it was the most lavish and most expensive postal building anywhere in Germany. Contracted by the Imperial Regional Directorate of Posts and Telecommunications, it was designed in the neo-baroque style and fitted out with the very latest telegraph technology. In the first few years of its existence it also served as a research and development centre for Germany’s radio communications. In 1919, the city’s pneumatic post service was established on the basement and ground floor levels, where it remained until it eventually closed down in 1977.

The machinery room in the basement of the Main Telegraph Office was preserved and could be admired by interested visitors right up until 2008. Together with the control systems, it is considered to be an important monument to the city’s industrial history. As part of the “Forum Museum Island” project, the entire building complex is currently being extensively refurbished, converted and extended for offices, shops and restaurants. The Monbijoustrasse wing is due to be transformed into a hotel.

Solution – light wells MEAVECTOR

In view of the historic nature of the buildings as well as heritage protection regulations, MEA concrete light wells were chosen for the project.
MEAVECTOR concrete light wells in combination with a steel attachment are being installed around the outside of the building complex as a modernisation measure and to ensure adequate ventilation of the basement. Our MEAVECTOR galvanised steel attachment is ideal for paving flush with the light well (in this case the pavement), so that the well’s concrete edge is no longer visible afterwards.

Verdict

The modernisation project is in full swing in summer 2017.

At a glance:

Share this content:

More References from MEA

MONOLITHIC DRAINAGE SOLUTION FOR DHL BASE IN ALTENSTEIG

The MEADRAIN DM monolithic drainage channel was used to drain the logistics area of the DHL base in Altensteig, Baden-Württemberg.

Read more

Drainage of the new production area of the Bachl company in Paitzdorf

The MEACRET LINE 200 concrete slotted channel was used for the expansion of the Bachl company's production site in Paitzdorf.

Read more

Roadway drainage of the federal road B 87

The innovative 2-1 drainage solution MEAKERB was used for the rehabilitation of the B 87 federal road between Duben and Luckau.

Read more