System solution MEARIN PG EVO

Ingolstadt is the second largest city in Upper Bavaria after Munich and is best known as the Audi city on the Danube. After nine months of planning and renovation, the Geiger Group is in the process of completing a modern five-storey office and development building there. The DESPAG Workspace project is based on a flexible room layout and designed to accommodate law firms, engineering and administrative offices. MEARIN PG EVO was installed as the appropriate drainage solution for the underground car park connected to the building.

SOLUTION: DRAINAGE SYSTEM MEARIN PG EVO

The Geiger Group, which has already used MEARIN PG EVO in several projects, also opted for the system solution from MEA Water Management for this project. Approximately 162 metres of the drainage channel made of glass fibre reinforced composite were used there. Convincing arguments in favour of the channel are its resistance to salt, oils and petrols, its sturdiness, the low total height of 30 mm and the easy installation.

IN A NUTSHELL

MEARIN PG EVO convinced as a fully fledged system solution. The convincing price and many years of good cooperation were the additional deciding factors.

 

AT A GLANCE:

  • Place: DESPAG Workspace, Ingolstadt, Germany
  • Products:
    • Drainage system MEARIN PG EVO (162 m)
Share this content:

More References from MEA

MONOLITHIC DRAINAGE SOLUTION FOR DHL BASE IN ALTENSTEIG

The MEADRAIN DM monolithic drainage channel was used to drain the logistics area of the DHL base in Altensteig, Baden-Württemberg.

Read more

Drainage of the new production area of the Bachl company in Paitzdorf

The MEACRET LINE 200 concrete slotted channel was used for the expansion of the Bachl company's production site in Paitzdorf.

Read more

Roadway drainage of the federal road B 87

The innovative 2-1 drainage solution MEAKERB was used for the rehabilitation of the B 87 federal road between Duben and Luckau.

Read more